HLW Technical Oversight Support
Street Legal Industries, Inc.About the role
Description
SCOPE OF WORK
The Department of Energy (DOE) Hanford Field Office (HFO) requires general support services
for the Waste Treatment and Immobilization Project (WTP) High Level Waste division. WTP
requires one (1) Part-time equivalent general support contractor (960 labor hours) to provide
support in the following areas:
? Provide oversight of contractor system design review program.
? Coordinate system design reviews for the WTP HLW systems.
? Assist the Hanford Interface Management Team with Interface Control Document (ICD).
? Coordinate to issue assessment and resolution with HFO engineering, regulatory, and
other supporting staff.
? Participate in Engineering, Procurement and Construction (EPC), WTP High Level Waste
(HLW) assessment progress and Direct Feed High Level Waste (DFHLW) configurations.
? Utilize excellent writing and communication skills in all interactions.
Work products shall be thorough, accurate, appropriately documented, and comply with
established criteria. The Contractor shall ensure that duties are performed in a competent and
professional manner. The Contractor employee shall submit a weekly report to the technical
monitor addressing work accomplished, and deliverable progress.
Requirements
PREFERRED EXPERIENCE & CAPABILITIES
? Comprehensive understanding of the Hanford Site Tank Waste mission, activities, and priorities.
? In-depth knowledge of DOE Hanford processes and procedures.
? Proficient in DOE’s program management practices, policies, and procedures.
? Experience with WTP project design, quality assurance and oversight
? Familiarity with, or ability to quickly learn and utilize, various technology management tools used at Hanford.
? Exceptional communication skills.
? Proficient in Microsoft 365.
? Expert-level proficiency in MS Word and Excel.
? HFO iCAS expert level proficiency
OTHER REQUIREMENTS
? Weekly status report emailed to the technical monitor at the end of each week. The weekly report shall be as detailed as requested by the technical monitor.
? Non-Disclosure/Conflict of Interest form signed by both the general support contractor and authorized contractor representative must be submitted to procurement before any work/support can start.
? Identification of any conflicts, potential conflicts, or perceived conflicts of interest with any Hanford Site contractors.
? Compliance with site specific safety and security requirements, including badging and office protocols.
? U.S. Citizenship
LOCATION
Work shall be conducted at the Hanford Field Office and the Hanford Site in Richland, WA. Potential Hybrid scenario with the approval of the technical monitor. However, candidate must be local to attend meetings. 960 hours/year part time.
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s