Jobs and Careers
BB

Sr. Construction Schedule Analyst

BB&E Consulting Engineers & Professionals
Kittery, Maine, United States, United Statesfull_timeVerifiedPosted 14 Jul 2026
💰 $190,000/yr($170,000/yr – $190,000/yr)

About the role

BB&E is an employee owned full service civil and environmental engineering and consulting firm, headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members provide Environmental Consulting, Facilities Engineering and Program/Project Management Services to Federal and private sectors.  

Position Summary 

BB&E is seeking a dynamic and detail-oriented Construction Scheduler to join our team, supporting BB&E’s A&AS contract, assisting NAVFAC Mid-Atlantic, and supporting facilities design and construction projects on-site at Kittery, ME.  

Job Duties 

  • Understanding interrelated construction projects within high-visibility Program Initiatives critical to the Navy’s mission.
  • Manage multiple priorities and independently develop technical recommendations or solutions for scheduling issues and time impacts on complex problems encountered during construction contract administration.
  • Presenting technical schedule analysis results (verbal and graphical/tabular) to leadership and non-technical stakeholders, with recommendations for schedule management when requested.
  • Developing and maintaining scheduling training for project teams, including training on network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage.
  • Guiding scheduling specifications for incorporation into project contract documents.
  • Participating in NAVFAC-sponsored Scheduling Working Groups to address lessons learned, propose software changes, and identify training requirements.
  • Supporting the development of schedule software templates for contractors to create baseline schedules.
  • Project delivery methods include both design-bid/build and design-build.

Specific Responsibilities

  • Initial Construction Planning:
    • Review the scopes of individual projects and based on actual performance metrics and project conditions, propose: 
    • Recommended provisions for inclusion in contract schedule specifications.
    • Reasonable construction durations to include in the RFP or solicitation.
    • Participate in Technical Evaluation Teams (TET) when selection factors involve contractor schedule and work plan submissions. 
    • Review and provide recommendations to the TET Chair.
    • Review of Baseline Schedules:
    • Review baseline schedules for validity, reasonableness, and depth of construction planning. Ensure compliance with contract schedule specifications.
  • Ongoing Schedule Oversight:
    • Lead the project team in reviewing monthly contractor updates for validity and conformance to contract requirements.
    • Coordinate with technical and non-technical NAVFAC personnel within the Facilities Engineering Command (FEC) and field offices.
    • Work closely with the Contracting Office, design management, estimating, and construction teams to ensure contract changes, non-conformances, and requests for information are accurately reflected in contract schedule updates.
    • Review the critical path and lesser float paths to determine progress concurrency and shared project float.
    • Advise the project team on the disposition of contractor-submitted schedule updates.
    • Alert the project team when the As-Built schedule diverges from the accepted Baseline Schedule.
    • Assist project teams in assessing contractor adherence to the project schedule.
  • Schedule Analysis:
    • Compile Time-Impact-Analysis (TIA) issue files and timelines as issues arise.
    • Review the baseline schedule and schedule updates to determine adherence to the original baseline, apart from identified time impacts.
    • Prepare as-built schedules, including narrative and graphical/tabular visualizations, to highlight delays and/or accelerations that affected timely project completion.
    • Assess the impact of contract changes on the schedule and support the development of the Government's position regarding delays and/or liability.
    • Utilize computer-based scheduling programs, applying Critical Path Method (CPM) analysis.
    • Assist in validating impacts on the construction schedule by comparing work reports.
    • Provide analysis and recommendations on how contractors can mitigate delays and meet the contract completion date.

Requirements

Key Qualifications 

  • U.S. Citizenship and the ability to obtain/maintain a NACI/CAC is required
  • Certification: Registration as a Planning and Scheduling Professional (PSP) is desirable
  • Strong Communication Skills: Excellent verbal and written communication skills, with the ability to effectively convey complex techni

Apply for this role

Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.

Apply Now →Generate Application Kit

Free account required — sign up in 30s

Company

BB&E Consulting Engineers & Professionals

View company profile →