Jobs and Careers
BE

Senior Pre Assembly Planner

Bechtel
Port Arthur, United Statesfull_timeVerifiedPosted 12 Dec 2024

About the role

Requisition ID: 281050 

  •  Relocation Authorized: National - Single 
  • Telework Type: Full-Time Office/Project 
  • Work Location: Port Arthur, TX 

 

Extraordinary teams building inspiring projects:

Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world's infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place. 

Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers' objectives to create a lasting positive impact. We serve the Infrastructure; Nuclear, Security & Environmental; Energy; Mining & Metals, and the Manufacturing and Technology markets. Our services span from initial planning and investment, through start-up and operations. 

Core to Bechtel is our Vision, Values and Commitments. They are what we believe, what customers can expect, and how we deliver. Learn more about our extraordinary teams building inspiring projects in our Impact Report

Project Overview:

The PALNG Project involves construction of a grassroots liquefaction and export facility along the Sabine-Neches waterway in Port Arthur, Texas. The Project is located in Southeast Texas on a region of land off the Sabine-Neches Waterway, which is connected to the Gulf of Mexico and the Intracoastal Waterway. Bechtel’s scope includes:  Two liquefaction trains, with capacity of producing 6.73 million tons per annum -Two 160,000 m³. LNG tanks - A marine facility with up to two LNG berths - A Material Offloading Facility (MOF) and two Pioneer construction docks - Condensate loading and refrigerant unloading truck facilities - And all other associated facilities and utilities, including electrical power, condensate and refrigerate storage, and flares. Feed gas for liquefaction will be supplied though a high pressure 42”-diameter, underground pipeline transporting interstate quality natural gas from multiple supply regions and reservoirs. Construction of the project will utilize approximately 937 acres of undeveloped land, wetlands, and open water; of which approximately 900 acres will be altered and repurposed for construction of the PALNG liquefaction facility. All vessel traffic will access the Project via the Port Arthur Canal. Additionally, all construction equipment, vehicles and personnel will access the site from State Highway (SH) 87.

Job Summary:

In this role, you will work with the project team to prepare and track schedule data for the onsite modular pre-assembly pipe rack work for the project's schedule ensuring correct sequence and on time availability for module setting at main jobsite areas. #LI-CS1

Major Responsibilities:

  • Prepares schedule data for modular preassemblies
  • Establishes and maintains the schedule for a specific discipline area or specialty
  • Performs schedule development duties to include establishing the work breakdown structure (WBS), determining the work activity duration, establishing the proper workflow logic ties
  • Performs schedule monitoring, including identifying critical activities and updating functions for specific applications, disciplines, or specialties
  • Develops critical path schedule reports and schedule performance metrics 
  • Determines critical-path activities for assigned discipline or specialty work activities supporting interdisciplinary requirements 
  • Identifies and reports activities that have a critical or potential impact on the schedule
  • Monitors and validates subcontractor schedules
  • Evaluates subcontractor schedules for required workarounds or potential schedule improvements

Education and Experience Requirements:

  • Requires bachelo

Apply for this role

Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.

Apply Now →Generate Application Kit

Free account required — sign up in 30s

Company

Bechtel

View company profile →