Jobs and Careers
CU

Senior Commissioning Manager - Data Center Construction

Cumming Group
USA Client Site - Texas, United States, United Statesfull_timeVerifiedPosted 17 Jul 2026
💰 $186,367/yr($133,100/yr – $186,367/yr)

About the role

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 10 rankings in ENR. With over 60 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!

Job Description

Cumming Group is currently hiring a Commissioning Manager to be based in Dallas, TX. The Commissioning Manager position is responsible for overseeing the commissioning of large data center projects from design through testing and turnover and support measures for improved system energy efficiency savings, clean energy generation, and mechanical/electrical system management.

The Commissioning Manager verifies that designed, installed, and tested systems and equipment satisfy specified performance criteria and meet the client’s operational requirements. This position is responsible for client satisfaction, project execution, business development support, and travel related to commissioning assignments.

Essential Duties & Responsibilities:

  • Lead and manage the commissioning process from project initiation through turnover, coordinating owners, design teams, contractors, vendors, and testing providers to ensure successful project delivery.

  • Develop Commissioning Plans and Commissioning Reports, which may include recommendations for optimizing building operations, functional checklists, deficiency logs, equipment operation and maintenance manuals.

  • Review Owner's Project Requirements (OPR) and Basis of Design (BOD) documents and verify alignment with project commissioning objectives.

  • Perform commissioning-focused reviews of design drawings, specifications, and material or equipment submittals at key project milestones and document findings, recommendations, and issue resolution.

  • Maintain commissioning issues logs and coordinate resolution of deficiencies identified throughout design, construction, startup, and functional testing. Track corrective actions and confirm resolution.

  • Perform periodic construction site observations to verify systems are being installed in accordance with design intent and requirements.

  • Verify completion of equipment startup activities, pre-functional checklists, TAB reports, and prerequisite documentation prior to functional performance testing.

  • Develop functional performance test scripts and procedures; witness and document functional performance testing performed by contractors, vendors, and testing providers. Verify testing is conducted in accordance with approved commissioning procedures; document results, observations, deficiencies, and corrective actions.

  • Review and validate contractor, vendor, and third-party testing reports for completeness, compliance, and consistency with commissioning requirements.

  • Verify completeness of project turnover documentation including training records, operation and maintenance manuals, as-built documentation, and system turnover packages.

  • Review, coordinate, and support development of Standard Operating Procedures (SOPs) and Methods of Procedure (MOPs) for critical facility operations and commissioning activities.

  • Perform fundamental and enhanced commissioning in support of client LEED goals.

  • Knowledge of building systems performance and solutions for reducing operational emissions.

  • Perform field energy audits and support development of ASHRAE Level audit reports.

  • Perform energy analysis on rates, and energy cost savings.

  • Identify and provide documentation for energy efficiency project opportunities contributing to Building or campus carbon emission reduction; specifically HVAC and Lighting systems.

  • Manage and provide analysis energy generation or clean energy and battery storage projects.

  • ​Support management of external resources as needed; schedule and direct periodic commissioning and related energy meetings; and attend construction and coordination meetings as required for each project.

  • Interface with clients, contractors, equipment vendors, testing providers, and internal project teams; execute project assignments; and collaborate with engineering, design, and project management staff to support successful project delivery.

  • This position may require travel throughout the U.S.

Knowledge & Skills Required:

  • Experience commissioning HVAC, electrical, plumbing, fire/life safety, controls, centr

Apply for this role

Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.

Apply Now →Generate Application Kit

Free account required — sign up in 30s

Company

Cumming Group

View company profile →