QA/QC Manager - Hyperscale Data Center Construction
Legacy Professional ServicesAbout the role
The QA/QC Manager is responsible for leading and implementing the Quality Assurance and Quality Control program on a large-scale hyperscale data center construction project. This role ensures all work meets contractual requirements, project specifications, industry codes, and owner standards, with a focus on mission-critical systems (MEP, commissioning, and fit-out). The QA/QC Manager will establish and maintain rigorous inspection protocols, coordinate third-party testing, and proactively engage with project teams, trade partners, and the client to drive a culture of quality and zero-defect delivery
Requirements
Quality Assurance & Planning
· Develop, implement, and manage the project-specific Quality Management Plan in alignment with company and client standards.
· Review and interpret construction drawings, specifications, and submittals to ensure compliance with contract documents.
· Conduct constructability and quality reviews during preconstruction and early trade coordination phases.
· Coordinate quality requirements with design teams, consultants, and client representatives.
Inspections & Field Execution
· Lead and document field inspections for structural, architectural, civil, and mission-critical MEP systems.
· Ensure proper execution of inspections and tests, including underground utilities, concrete, steel, prefabricated assemblies, and clean agent/specialty systems.
· Oversee and manage third-party testing and inspection agencies, ensuring accurate documentation and resolution of nonconformances.
· Proactively monitor installation methods and workmanship to mitigate punch list and rework.
Trade Partner & Stakeholder Engagement
· Train and coach subcontractors and field staff on quality requirements, processes, and best practices.
· Collaborate closely with Safety, Commissioning, and VDC/BIM teams to ensure coordinated quality across disciplines.
· Facilitate quality-focused meetings with stakeholders, ensuring timely resolution of quality issues.
Documentation & Reporting
· Maintain and manage all quality-related logs, inspection reports, test results, and deficiency tracking using project management software (e.g., Procore, BIM 360, Bluebeam).
· Track and report KPIs on defect trends, rework costs, and inspection performance.
· Ensure proper close-out documentation, O&M manuals, and turnover packages are complete and accurate for client acceptance.
Qualifications
· Bachelor’s degree in Construction Management, Engineering, or related field (preferred).
· 7+ years of experience in QA/QC management within large-scale construction, with at least 3 years on mission-critical or hyperscale data center projects.
· Strong knowledge of construction codes, standards, and specifications (ICC, NFPA, ASHRAE, IEEE, NEC, etc.).
· Familiarity with owner standards and requirements for hyperscale clients (Meta, Google, Microsoft, Amazon, etc.).
· Proficiency with construction management software (Procore, BIM 360, Bluebeam, CMiC).
· Exceptional communication, leadership, and problem-solving skills.
· Certifications such as ASQ Certified Quality Manager, CQM-C (USACE/NAVFAC), or ICC preferred.
Key Competencies
· Detail-oriented with a proactive approach to quality.
· Strong leadership and ability to influence cross-functional teams.
· Excellent organizational and documentation skills.
· Ability to thrive in fast-paced, large-scale project environments.
· Commitment to zero-defect project delivery and continuous improvement.
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s