Medium/High Voltage Construction Electrical Engineer (Experienced Professional)
MichelinAbout the role
Build a Career That Matters with One of the World’s Most Respected Employers!
- - - - - - - - - - - -
THE OPPORTUNITY
This opportunity is in Woodburn, Indiana in our BF Goodrich tire plant. Woodburn is a small town located about 30 mins east of Fort Wayne, IN. Fort Wayne is the cultural and economic center of northeastern Indiana and the second largest city in Indiana. Established in 1961, our plant makes passenger and light truck tires.
WHAT YOU WILL BRING
- The Electrical Engineer provides project management and technical support for the design and construction of electrical site work, utilities, and buildings. Education and work experience requirements
- BS Electrical Engineering for Design and Procurement Phases with 5+ years of experience on industrial projects preferred. Degree or Significant Experience for Industrial Construction and acceptance phases 5+ years of experience with degree or 10+ years of experience with field supervision on industrial projects required.
- Professional Engineering License is a plus.
- Demonstrated leadership experience.
- Demonstrated strong organizational skills and project management ability.
- Strong skills in written and verbal communication.
- Demonstrated ability to set and achieve goals with minimum supervision and the ability to suggest and implement ideas to bring value to the team.
- Demonstrated solid teamwork, communication, and planning skills required.
- Demonstrate good understanding of electrical designs and practices for medium and low voltage distribution systems, building power, emergency power and lighting distributions, fire detection, data and networking, intrusion and access control, BMS controls and automation, lighting protection systems, grounding and bonding.
- Software Proficiency Requirements: Microsoft Excel, Project, Word.
- Completed 10-hour OSHA safety training.
- Demonstrate a professional attitude by treating each person with respect on the job.
WHAT YOU WILL DO
1 - Design Phase
a) Work with the design team daily to answer questions, monitor the design, and evaluate progress.
b) Participate in design reviews at 30%, 60%, 90%, and final detail design review and IFC documentation.
c) Participate in 3D Model conflict resolution by disciplines.
d) Participate in the analysis of design proposals as part of the Michelin Design Team under the direction of the Michelin Design leader.
e) Conduct analysis and provide weekly reports concerning the proposed technical solutions, costs, staffing plan, completion schedule, permitting plans, and other details provided by each EPC. Evaluate and grade the proposals providing recommendation to Michelin.
f) Provide a risk analysis for the technical concepts for all systems and equipment.
g) Assist Michelin with change management by evaluating technical solutions, completing estimates, providing a risk analysis and supporting the procurement manager as needed with information.
2 – Procurement Phase
Review material and construction packages with the EPC company prior to issue. Provide a report concerning the quality of the package and adherence to the contract requirements.
b) Review the top 2 responses to each procurement package. Provide a report concerning the quality of the package and adherence to the contract requirements.
c) Review material and equipment shop drawings after review by the EPC company. Provide a report concerning the adherence to the contract requirements.
3 – Construction Phase
a) Participate in pre-construction meetings and provide input and comments to the meeting to add value to the construction process.
b) Planning for construction and authorization to start construction.
c) Validate readiness of GC and subs for task execution based on preplanning action list.
d). Finalize a work scope and schedule with Site management.
e). Setup safety work expectations with GC and subs
f). Setup QA and task acceptance expectations with GC and subs.
g). Finalize and approve Schedule targets for GC and subs. Supplement schedule with the risk matrix and recovery plans.
h) Authorization to start construction.
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s