Jobs and Careers
EI
Chef d'Equipe (F/H)
EiffageFrancefull_timeVerifiedPosted 3 Mar 2025
About the role
<p>Eiffage Route contribue à l’amélioration du réseau français, des voies communales aux tracés autoroutiers, qu’il s’agisse de conception, de construction ou d’entretien. Experte en aménagement urbain, Eiffage Route participe également à la réalisation de projets portuaires, aéroportuaires, industriels et commerciaux.</p><p></p><p></p>MISSIONS
Team management
• Complete onboarding of employees, temporary staff and sub-contractors Present the building site, its challenges, risks and the construction works to be completed to employees
• Perform role of Deputy Site Supervisor, act as interim manager by delegation or necessity
• Manage building site personnel on a daily basis, ensure that schedules are respected and promote initiatives and positive conduct
• Organize and plan the missions and the work of the teams, based on building site requirements and progress, in close collaboration with the Site Supervisor
Building site preparation and organization
• Prepare the work for completion by recognizing the constraints of the plot and the work documentation, as well as building site access and environment
• Clearly define construction works to be completed, develop underground networks and to identify all obstacles that could impact completion
• Ensure the implementation of signage and security devices, prepare the access roads, storage areas and set up the building site’s living quarters, if appropriate (manage the company’s brand reputation: labeling, marking, etc.)
• Plan ahead for equipment and materials needed, in agreement with the Works Supervisor
• Participate in defining the construction works schedule and operating procedure
• Supply and install the tools, materials and consumables on the building site (the right amount, at the right size and in the right place)
• Receive and check the equipment, materials and tools; put them in place at the building site Check their compliance with approved product sheets
Monitoring of the building site’s construction
• Assign tasks to blue collar workers and technicians based on skill sets and added value
• Monitor the progress of the works schedule
• Supervise the construction of the works based on the schedule, operating procedure and analysis of the risks identified
• Perform technical checks during construction (materials, production of materials on the site, compliance with the plan, etc.) and decide on any corrections to be made together with the Site Supervisor.
• Track consumption (hours, materials, equipment), analyze deviations and determine the necessary corrective actions
• Participate in building site meetings
• Ensure the proper use and maintenance of equipment and facilities by performing the necessary maintenance and upkeep
• Draft and communicate monitoring records and building site reports
• Ensure access to documentation currently in force to be used (plans, procedures, etc.)
Quality, Prevention, Security and Environment
• Ensure full application of guidelines, procedures and rules to oversee individual and collective security on the building site
• Produce reporting for various managers regarding the completed construction works and difficulties experienced
• Ensure the quality and security of the construction works within planned lead times
• Manage environmental constraints and ensure the full adoption of the corresponding measures
• Before leaving the construction work area, ensure the quality of the services provided (acceptance, resolution of stop points or feedback items, cleanliness, etc.)
• Weekly team security management (Safety Force, Security 1/4 hour, etc.)
Building site tidy-up and withdrawal
• Participate in construction handover and resolution of stop points
• Ensure regular cleaning of the work area and security of surrounding area
• Actively participate in building site withdrawal, ensuring the return of materials and equipment and the disposal of waste
• At the end of workdays, ensure building site equipment is fully stored and secure
• Ensure that the equipment and materials are restored to their initial state; indicate any deteriorations
• Inventory remaining supplies and returned equipment, identifying discrepancies and reasons
SPECIFIC ACTIVITIES
CIVIL ENGINEERING/DAM TEAM LEADER
Building the foundations
• Excavation floor protection
Formwork
• Set up the formwork for the foundations or bosses
• Assemble and use outdoor work stations and platforms
• Assemble and adjust the climbing forms and other formwork
Reinforcement
• Assemble reinforcements based on the reinforcement plan: raft foundations, walls, veils, beams, slabs, etc. For pre-stressed constructions: beams, vessel walls, etc.
Concrete placing
• Deploy and vibrate concrete
• Carry out concrete checks
• Spray the concrete using the wet-mix or dry-mix process
Shoring
• Assemble and check the scaffolding used for access, working platforms and shoring
• Manage dismantling operations
Networks installation: hydraulic equipment
Prefabricated parts installation: stan
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s