Jobs and Careers
TU

Document Controller – Data Center Construction

Turner & Townsend
Haskell, TX, United States, United Statesfull_timeVerifiedPosted 24 Oct 2025

About the role

Company Description


Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programmes as we turn challenge into opportunity and complexity into success. 

Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. 

Job Description


Turner & Townsend is seeking an experienced and detail-oriented Document Controller to manage and maintain all project documentation for a key tech client’s data center construction program in Texas. The ideal candidate will be responsible for ensuring the accurate, timely, and organized control of all project-related documents, both electronically and in hard-copy form, throughout the project life cycle. This role requires strong organizational skills, meticulous attention to detail, and the ability to work effectively with diverse teams across multiple project locations. 

Responsibilities:

  • Manage and maintain the project's Electronic Document Management System (EDMS), ensuring all users adhere to established procedures.
  • Control and track all project documents, including drawings, submittals, RFIs, change orders, contracts, and correspondence, to ensure proper versioning and revision history.
  • Distribute approved documentation to the appropriate project personnel, consultants, and contractors, maintaining up-to-date distribution lists and tracking receipts.
  • Review documentation submitted by project teams for completeness, accuracy, and compliance with project standards before entry into the EDMS.
  • Act as a central point of contact for documentation requests, coordinating the flow of information between internal teams, external partners, and the client’s project management representatives.
  • Generate and prepare various project reports, including document status reports, transmittal logs, and document control audits, for senior managers.
  • Assist in compiling and formally reviewing construction turnover documentation and archiving all project files at project completion.
  • Provide training and support to project team members on document control procedures and best practices.
  • Maintain a high level of confidentiality regarding sensitive project information and terms of agreement. 
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable. 

Qualifications

 

  • Proven experience as a Document Controller, preferably on large-scale, multi-disciplinary construction projects.
  • Experience with data center, mission-critical, or high-tech facility construction is highly preferred.
  • Strong knowledge of Document Control principles and procedures.
  • Proficiency with Electronic Document Management Systems (EDMS), such as Aconex, SharePoint, or similar platforms.
  • High proficiency in Microsoft Office Suite, including Word and Excel.
  • Exceptional organizational skills and a strong attention to detail.
  • Excellent communication and interpersonal skills, with the ability to work collaboratively in a fast-paced environment.
  • Self-motivated with a client-focused attitude.
  • Familiarity with compliance requirements related to construction documentation (e.g., SOX controls). 

Preferred Qualifications:

  • Bachelor's degree in a relevant field is a plus.
  • Experience supporting projects with multiple, concurrent workstreams.
  • Ability to adapt and manage documentation needs across multiple, simultaneous projects.  

Additional Information


*On-site presence and requirements may change depending on our client's needs.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creat

Apply for this role

Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.

Apply Now →Generate Application Kit

Free account required — sign up in 30s

Company

Turner & Townsend

View company profile →