Temporary Facilities Field Engineer
BechtelAbout the role
Requisition ID: 279845
- Relocation Authorized: National - Camp
- Telework Type: Full-Time Office/Project
- Work Location: Thacker Pass,NV
Extraordinary teams building inspiring projects:
Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world's infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place.
Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers' objectives to create a lasting positive impact. We serve the Infrastructure; Nuclear, Security & Environmental; Energy; Mining & Metals, and the Manufacturing and Technology markets. Our services span from initial planning and investment, through start-up and operations.
Core to Bechtel is our Vision, Values and Commitments. They are what we believe, what customers can expect, and how we deliver. Learn more about our extraordinary teams building inspiring projects in our Impact Report.
Project Overview:
Thacker Pass is the largest known lithium resource in the United States and the next large-scale lithium mine. The project has all permits required to commence construction, which is expected to start in 2023. Engineering design and procurement of long-lead equipment is underway, with early works being coordinated.
This project falls under the Lithium Americas umbrella of Lithium Nevada Corporation (LNC). Project site is located ~3 hours northeast of Reno at the southern end of the McDermitt Caldera in Humboldt County, NV, and ~25 miles from the Nevada-Oregon border (or ~1 hour northwest of Winnemucca, NV).
The Project will be developed as an open-pit mining operation using conventional, continuous mining equipment. Given the soft, clay nature of the deposit, minimal blasting and crushing is anticipated. The ore will then be processed in a leaching circuit using sulfuric acid to liberate the lithium from the claystone. Following the leaching process, the lithium bearing solution will be purified using crystallizers and reagents to produce battery-quality Li2CO3.
The Thacker Pass site has a flat and expansive terrain which allows for a very compact footprint and for future potential expansions.
Bechtel will have responsibility for the full EPC/EPCM scope.
Job Summary:
In this role, you will provide project field engineering specialization and expertise with work planning and packaging, material management, quantity verification and validation, safety and quality control, technical inspection and testing knowledge, and subcontract coordination. Your recommendations will ensure field engineering activities operate safely, are complete, and conform to quality standards and project requirements. #LI-NP1
Major Responsibilities:
Work Planning & Packaging
- Prepares construction drawings and sketches.
- Leads preparation of construction drawings and schedules and the design of temporary construction facilities and ensures preparation of "as built" drawings and other job plans.
Material Management
- Initiates requisitions for field purchases.
- Prepares quantity takeoffs of field purchased material and equipment.
Quantities
- Verifies commodities on quantity tracking systems or other computer database systems as required.
Safety / Quality Control
- Ensures zero accident philosophy and requirements are implemented and adhered to by craft and others when in the operational area, and tools and equipment are in safe condition and operated safely.
Technical
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s