Jobs and Careers
TE

2026 Summer Engineering Internship / Co-Op

TECO Energy
United StatesinternshipVerifiedPosted 4 Feb 2026

About the role

Title: 2026 Summer Engineering Internship / Co-Op 
Company: Tampa Electric Company 
State and City: Florida - Tampa
Shift: 8 Hr. X 5 Days

 

 

Where Your Education Meets Opportunity
Are you a college student ready to gain real-world experience in your field of study? The TECO Energy Student Program is your opportunity to apply classroom knowledge in a professional setting, contribute to meaningful projects, and grow your career from day one.
We partner with accredited four-year colleges and universities to recruit motivated students who are eager to learn and make an impact. As a student with us, you’ll take on challenging assignments that align with your academic background and our business needs—giving you a head start on your future.

Why Join Us?
⦁    Hands-on experience in your area of study
⦁    Meaningful, project-based work
⦁    Professional development and mentorship
⦁    A supportive, inclusive work environment

Start building your future with TECO Energy.

Position Summary/Details:
This position is responsible for the coordination and design of Tampa Electric Company’s (TEC) distribution system, including new construction and maintenance projects. This position will establish relationships with customers and local agencies to determine the requirements for providing service. The Engineer will generate and manage projects using TEC tools, and create the necessary permit and construction drawings. The Engineer will be responsible for the successful coordination of the project with TEC departments to completion.

Key Responsibilities and/or Learning Objectives
1. Meet with customers and/or their agents (Customers) to conduct needs and feasibility assessments 
on multiple construction projects and load additions of varying scale. Manage the schedule and 
required completion dates of different construction phases. 
▪ Manage communication to all involved entities concerning any updates in the construction 
schedule or other changes with potential impact, documenting updates through letters and 
emails, as necessary.
▪ Coordinate and manage the construction activities between TEC Planning & Scheduling, Field 
Construction, Operations, the Customer, and any other ED Departments.
▪ Represent customers in weekly POW meetings with all involved TEC departments.
2. Create and manage work requests (WR) in the Work Management System (WMS). Divide jobs into 
phases/crews, establishing an associated WR for each of the different TEC construction 
phases/crews involved: including overhead line crews, underground line crews, service crews, 
grounding contractors, project conduits, and crossing conduits. Enter and continually update 
targeted schedule dates, work status, and other project details in WMS for all associated WRs. 
3. Perform analysis to determine the most economical and reliable solutions for customers and the 
TEC distribution system.
▪ Calculate and analyze customer load for proper sizing of TEC facilities
▪ Design and determine TEC facility locations
▪ Design to NESC and TEC specifications, providing pole loading analysis, cable pulling 
calculations, ruling span calculations, clearances, motor start calculations, voltage drop, and 
sag calculations.
▪ Adhere to Florida Administrative Code (Tariff)
4. Using TEC’s geographical information system (GIS), design the proposed and update existing 
electrical features (company assets). Establish all specifications in GIS, such as the correct 
electrical connectivity, proper supporting structures, and all compatible units (CU) for materials 
and labor. Resolve any identified errors in GIS, ensure all GIS task types are linked to the WMS WRs, 
and export GIS material data to WMS.
5. Produce and/or oversee the production of construction prints for Field Construction, Operations, 
and/or contractors:
▪ Verify and approve that locations of TEC’s existing and proposed equipment and any third 
party infrastructure (water, sewer, storm, gas, telephone, and cable lines) are adequately 
identified on the construction prints, and equipment specifications are captured.
▪ Based on the scope of construction and company safety standards, determine necessity and 
scale of Maintenance of Traffic (MOT) plan that Field Construction, Operations, and/or 
contractors would need for completing work in the right-of-way.
▪ Prepare GIS prints to submit to regulatory agencies for DOT, City, County, or other required 
governing agency permits.
▪ Generate construction prints that clearly communicate the plan of work to the field crews.
6. Produce construction cost estimates

Apply for this role

Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.

Apply Now →Generate Application Kit

Free account required — sign up in 30s

Company

TECO Energy

View company profile →