Jobs and Careers
FO
Final Assembly Engineering PVT/Quality Manufacturing Engineer
Ford Motor CompanyKansas City, United Statesfull_timeVerifiedPosted 26 Apr 2024
About the role
The Final Assembly Engineering (FAE) Plant Vehicle Team (PVT) is a co-located cross-functional team having the primary responsibility to manage the actions to improve current model quality. The PVT/Quality Engineer is a SPOC for FAE responsibilities which include the following:
- ECB/BSAQ/VRT/Quality
- VRT functions (team meetings, management reviews, VQRs)
- Lead for Process/Manufacturing issues, except those that are plant/operator/maintenance controllable.
- VOME VRT Core Projects - VOME direction
- Support implementation of core group specific strategies (EOL, alignment, tire room, tooling, and processes)
- Confirm alignment with VOME standards for added process/tooling quality improvement actions.
- Address ECB using BSAQ process
- Support clarification of GSAR by reviewing warranty claims, QNPS, verbatims, and additional internal indicators (First run, CAL, 25 mile drive, M10) as required
- Review daily ECB binning with VRT team for proper responsibility (Process, Design, Supplier Design, Supplier Process)
- Represent VOME at VRT to address manufacturing controllable items based on plant internal quality indicators (QLS, FCPA)
- Assist in the development and management of the BSAQ roadmaps to deliver the VRT objectives (CPU and R/1000 reductions) by implementing revisions to the following:
- Tooling, equipment, and facilities
- Process
- Error proofing implementation (DC tools, barcode scan, & pick lights)
- Lead / Participate in the Identification of Common Cross Vehicle line concerns for resolution.
- Support VOME Advanced Feasibility group to provide them the quality-related information/data they require from all plants.
- VRT functions (team meetings, management reviews, VQRs)
Core VO Deliverables Performed by PVT
- Process Sheets/PFMEAs/Corporate Process Initiatives
- GSPAS maintenance
- Process development and production process sheet updates for PVT released new content
- Delta Audits (review process sheet deck per VOPQUG219) & issue resolution
- ECN maintenance per WERS releases & VRT directed initiatives
- Process deck maintenance (Parts, Tools, Process, Usages, Orphan & Unclaimed parts, etc) per VOPGONA206
- Local PFMEA updates
- Local Control plan approvals (as required) and ongoing adherence (VOPQUG-051)
- Support plant process investigation and compliance to the standards for GERT
- GSPAS maintenance
- Launch/Process Support (for those PVT’s without a Resident Manufacturing Program Team (MPT): Reference Manufacturing Program Team R&R document for a full description)
- Major program launches (PVT is incremental support from MP1 through OKTB, that still allows for the PVT VOME engineers to maintain all PVT responsibilities)
- Minor programs and running changes as agreed to between PVT/MPT management which entail:
- Assembly feasibility to be done by MPT and Core.
- AIMS meetings: Issue resolution, validation and documentation
- Change Control, review all WERS concerns, assess for VO impact (Determine tooling, equipment, facilities and labor costing)
- Tooling, equipment and facilities development, buyoff and installation
- Lead core functional responsibilities including, EOL, HLA, alignment, fluid fill, tire room, AVIS, and other FAE/BCE tooling and processes.
- Error Proofing updates and/or additions
- AIS updates aligned with new Teledata/Broadcast codes
- Vacca Matrix (Total Plant Content)
- Support in plant trials and prove-out associated with:
- Engineering concerns, MCR actions, Alerts and PSOs
- TPPS studies/TISS reports
- PVT manage-the-change process (MTC) FAP02-057
- Safety & ergonomic concern evaluation and resolution (Zero red ergonomic concerns)
- Part complexity evaluations and resolutions
- Corporate Strategy implementation – aligned with VOME FAE/BCE Advanced Feasibility and Planning group
- Manage overall PVT program and OPD budgets (VOME PVT Checkbook for tooling, equipment and facilities):
- Process PNs, RQ’s through PO release
- Process PFR documentation
- Perform regular uncommitted funds reviews for all PVT impacted PINS
- New Model Launch PVT led Scorecard meeting report outs/reviews from <LR> through OK-To-Buy
- Support for containment on Stop Ships. Support VOME PAC papers (Stop Ships, D-PAC, FSA) for root cause identification and containment.
- Assist with Incoming Quality (IQ) and vendors on part quality issues
- Perform a new COP Health Chart Assessments on minor launch as required
- 6-Sigma
- Support effort for all VOME PVT engineers t
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s