Water Treatment Technical Lead
ISGAbout the role
Description
ISG is excited to bolster our team with a Water Treatment Technical Leader to join our team. Our Water/Wastewater team serves the essential Municipal and Industrial clients throughout the entire US and are comprised of employee owners in Sioux Falls, Storm Lake, Des Moines, and St. Louis Park offices. We are a full-service, multi-disciplinary team, who perform award winning work in planning, design, survey, and construction.
As an ISG Employee Owner, you would work directly with our Group Leader Rachel Kloos, who brings over 18 years of experience in the Water/Wastewater industry, including a focus on sustainability and water reuse applications. In addition, you will work closely with other our other Group Leaders Tom Grafft in Storm Lake and Lenny Larson in Des Moines. Our Water/Wastewater Practice Group Leader is Casey Patton, based in Des Moines.
Here are some projects we’ve worked on recently that might give you a better sense of what you’ll be doing day to day:
- Clarion Water Treatment Plant: The City of Clarion contracted with ISG to assist them with the planning, design, and construction of a new reverse osmosis water treatment plant capable of producing approximately 1 million gallons of water per day. The reverse osmosis system includes the membranes as well as pressure filters, holding tanks, transfer pumps and chemical feed systems necessary for the proper treatment of the water. Also included in this project were the installation of three vertical high service pumps and the rehabilitation of a well house. This project was funded through USDA and SRF funding sources. ISG provided the preliminary engineering report, pilot water plant assistance, funding assistance, survey, design, permitting, bidding, and construction phase services for this project. The water treatment plant is currently under construction with a completion date scheduled in mid-2024.
- Rockwell City Water Reclamation Facility Improvements: The City of Rockwell City contracted with ISG to assist them with the planning, design, and construction of improvements to their existing water reclamation facility to provide for the treatment of a daily average of 350,000 gallons of sewage, with a total capacity to handle up to 3.8 million gallons of sewage per day during a wet weather event. The reclamation facility consists of headworks, equalization basin, and an activated sludge treatment process consisting of anaerobic, anoxic, and aeration basins and sludge pumping, storage, and handling facilities. Also included in this project was providing uv-disinfection of the effluent prior to discharge along with a process building and associated mechanical, electrical, and plumbing systems. ISG provided the preliminary engineering report, funding assistance, survey, design, permitting, bidding, and construction phase services for this project. The facility improvements were completed in 2023.
- Sanitary Sewer and Wastewater Treatment Plant Improvements – ISG developed cost – savings solutions to lower the chloride and e. coli effluent levels to meet State standards for the City of Pocahontas’s wastewater treatment plant and recommended efficiency improvements to its aging sanitary sewer system.
ESSENTIAL DUTIES
- Provide technical support on complex, multi-disciplined industrial wastewater and water projects including data analysis, preparation of design calculations, drawings, and other technical work as required
- Demonstrate knowledge in chemical, mechanical, and/or biological treatment processes
- Conducts quality assurance and quality control on projects
- Participates in constructability review, field observation and inspection during/after construction phases
- Leads the preparation and coordination of the project specifications with construction documents
- Serve as the Project’s point of contact with clients, agencies and others to obtain and determine project requirements and approvals
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s