Production Scheduling Planner
See's CandiesAbout the role
Work is Sweet!
'Quality without Compromise' is not just a motto at See’s Candies. It is the most important ingredient in our recipe for success. See’s Candies has been in business since 1921 and maintains a reputation for producing the highest quality candy and providing superior customer service.
See’s is a leader in the confectionery industry with over 250 retail shops across the USA, a growing e-commerce business, and expanding opportunities internationally. We are seeking friendly, enthusiastic individuals who are passionate about helping us grow and thrive in our second century.
Job Description Summary:
Position SummaryThe Production Scheduling Planner is responsible for developing, executing, and continuously optimizing production schedules for a high-volume candy packing facility. This role ensures alignment between demand, capacity, and material availability while maintaining strict adherence to food safety, allergen control, and perishability standards.
The Planner plays a critical role in daily execution using Ross ERP and PlanetTogether (or similar advanced planning systems), ensuring accurate scheduling, material readiness, and On-Time, In-Full (OTIF) delivery performance.
The pay range for this position at commencement of employment is expected to be between $34-$38 per hour; however, base pay offered may vary depending on multiple individualized factors, including market location, job-related knowledge, skills, and experience.
Job Description:
Core Responsibilities
Production Scheduling & Execution
- Develop and manage a rolling Master Production Schedule (MPS) aligned with forecasts, orders, and capacity constraints.
- Sequence production to optimize throughput, minimize changeovers, and manage allergen transitions.
- Firm, release, and adjust jobs to ensure accurate execution on the floor.
- Rapidly respond to changes in demand, materials, or production performance.
System & Data Management (Ross ERP + PlanetTogether)
- Execute daily scheduling activities within Ross ERP and PlanetTogether ensuring data accuracy and system alignment.
- Maintain integrity of MRP signals, work orders, and inventory transactions.
- Publish and communicate production schedules to operations and stakeholders.
Inventory WIP and FG Materials & Control
- Manage materials and packaging using FEFO (First-Expired, First-Out).
- Monitor shortages, excess, and expiring inventory to minimize waste.
- Coordinate closely with Procurement and Warehouse to ensure material readiness.
Cross-Functional Coordination
- Partner with Operations, Procurement, Sales, and Warehouse teams to align priorities and resolve constraints.
- Communicate risks, delays, and schedule changes proactively.
Food Safety & Compliance
- Schedule production to prevent allergen cross-contact and ensure proper sanitation sequencing.
- Support compliance with GMP, HACCP, and SQF/BRC standards.
Performance & Continuous Improvement
- Monitor KPIs such as schedule adherence, OTIF, downtime, and inventory health.
- Identify and drive improvements in scheduling, system usage, and material flow.
Execution Responsibilities
- Review, validate, and maintain MRP jobs (inside and outside frozen horizon).
- Firm, sequence, and align jobs in Ross ERP and PlanetTogether (PT).
- Schedules personnel strategically to maintain productivity and operational efficiency.
- Ensure schedule accuracy (Need Date vs. Schedule Date) and release jobs.
- Identify and resolve material shortages and production constraints.
- Maintain frozen horizon integrity (remove obsolete jobs, firm required orders).
- Monitor inventory (FEFO, expiring, excess) and material availability.
- Run and review key reports (Inventory, Material Requirements, Production Schedule).
- Publish and communicate the daily production schedule.
- Resolve scheduling exceptions (late/early jobs, >8-hour activities, out-of-horizon jobs).
- Address demand gaps (demand without supply) and balance inventory plans.
- Review forecast exceptions and adjust plans accordingly.
- Validate system data (missing templates, message logs, errors).
- Review upcoming 4-week schedule to ensure readiness and alignment.
- Monitor expiring and leftover inventory to support FEFO compliance.
- Review key system reports (SQL-based), including:
- Inventory by Day
- Material Requirements
- Production Schedule / Job distribution
Weekly Planning & Control
Apply for this role
Generate a tailored application kit with a matched cover letter, interview prep, and CV highlights — in under 60 seconds.
Apply Now →Generate Application KitFree account required — sign up in 30s